Selected Work

The proof
is in the pour.

SR-9 Interchange Widening
Featured · Miami-Dade, FL · 2025

SR-9 Interchange Widening

FDOT Phase III · 1.8mi mainline + 4 ramps

Brickell Mixed-Use Tower
Miami, FL · 2025

Brickell Mixed-Use Tower

Podium deck + post-tension slabs, 24 floors

Wynwood Industrial Tear-Down
Miami, FL · 2024

Wynwood Industrial Tear-Down

32,000 sq-ft selective + structural demolition

Coral Gables Estates Foundations
Coral Gables, FL · 2024

Coral Gables Estates Foundations

18 residential slabs, HVHZ-rated

Pinecrest Estate Slab & Pool Deck
Pinecrest, FL · 2024

Pinecrest Estate Slab & Pool Deck

Stamped concrete, 4,200 sq-ft

Palm Beach Custom Driveway
Palm Beach Gardens, FL · 2023

Palm Beach Custom Driveway

Decorative stamped concrete, 2,400 sq-ft

Call (786) 730-8367