Selected Work
The proof
is in the pour.

Featured · Miami-Dade, FL · 2025
SR-9 Interchange Widening
FDOT Phase III · 1.8mi mainline + 4 ramps

Miami, FL · 2025
Brickell Mixed-Use Tower
Podium deck + post-tension slabs, 24 floors

Miami, FL · 2024
Wynwood Industrial Tear-Down
32,000 sq-ft selective + structural demolition

Coral Gables, FL · 2024
Coral Gables Estates Foundations
18 residential slabs, HVHZ-rated

Pinecrest, FL · 2024
Pinecrest Estate Slab & Pool Deck
Stamped concrete, 4,200 sq-ft

Palm Beach Gardens, FL · 2023
Palm Beach Custom Driveway
Decorative stamped concrete, 2,400 sq-ft
